Posts Tagged ‘code’

Bridging Method Phase 4

Thursday, February 11th, 2010

Bridging Method Phase 4

Phase 4. During the preparation of the Construction Documents (“CD”) phase the Contractor’s AE completes all detailed engineering design and specifications. Any remaining details of the architectural and site development design are completed in accordance with all applicable codes and fully coordinated these documents. The ODC reviews these documents for full and complete compliance with the BCDs and may reject them if (more…)