Bridging Method Phase 4

Phase 4. During the preparation of the Construction Documents (“CD”) phase the Contractor’s AE completes all detailed engineering design and specifications. Any remaining details of the architectural and site development design are completed in accordance with all applicable codes and fully coordinated these documents. The ODC reviews these documents for full and complete compliance with […]

Bridging Method Phase 3

PHASE 3 : THE RECEIPT OF BIDS FOR OR NEGOTIATION OF THE DESIGN-BUILD FORM OF CONTRACT Phase 3. With the BCDs as the “bidding” documents (see Article 4), the Owner can obtain competitive bids or negotiate with a single selected Contractor for a design-build form of construction contract. This contract price is fully enforceable, with […]

Bridging Method Phase 2

PHASE 2 OF CARRYING OUT A PROJECT BY THE BRIDGING METHOD IS CRITICALLY IMPORTANT AND SETS THE METHOD APART FROM OTHER METHODS Phase 2. Design work and specifying done in this phase are referred to as the preparation of the Bridging Contract Documents (BCDs) and involve the ODC developing all important and critical aspects of […]