Posts Tagged ‘schematic’

Bridging Method Phase 1

Tuesday, January 26th, 2010

Bridging Method Phase 1

FIRST DESIGN PHASE IN THE BRIDGING METHOD OF CONSTRUCTION PROJECT DELIVERY

Phase 1. The design work and documents prepared in this phase are the same in every respect in both the traditional Design-Bid-Build and the Bridging methods. Prior to this phase, in both methods, the Owner will have selected the design architect, whether an individual, a team, or a firm. The design architect team or firm will include consulting engineers for at least mechanical, electrical, plumbing and structural (“MEPS”) engineering disciplines. In the traditional Design-Bid-Build method this team is referred to as “the Architect’. In Bridging, this team is referred to as the Owner’s Design Consultant (“ODC”) including the ODC’s engineering consultants. The ODC nomenclature is used in Bridging to make clear that (more…)