Bridging Method Phase 4

Phase 4. During the preparation of the Construction Documents (“CD”) phase the Contractor’s AE completes all detailed engineering design and specifications. Any remaining details of the architectural and site development design are completed in accordance with all applicable codes and fully coordinated these documents. The ODC reviews these documents for full and complete compliance with […]

Bridging Method Phase 1

FIRST DESIGN PHASE IN THE BRIDGING METHOD OF CONSTRUCTION PROJECT DELIVERY Phase 1. The design work and documents prepared in this phase are the same in every respect in both the traditional Design-Bid-Build and the Bridging methods. Prior to this phase, in both methods, the Owner will have selected the design architect, whether an individual, […]